Blog
Ribtec tubes
Rib Shop fitted these new Hypalon tubes to this Ribtec 7m. We collected the Rib from Condor in Portsmouth after it was shipped over from Guernsey for the job to be carried out. After the works were complete, Rib Shop dropped the boat back to Portsmouth for its return trip. If you're in the Channel Islands, we can help arrange transport of your vessel to the UK, or alternatively, we can arrange to fly to you to carry out the required works. Please call or email to discuss your requirements.
…
18th Apr 2015
Ribtec Rib re-fit
Rib Shop have been chosen to carry out the extensive Rib
re-fit of a Ribtec 7.5 metre Rib.The Rib re-fit will include complete strip of engine, electronics,
consoles, seating, tubes, deck, bulkheads and stringers.Step 1: Remove tubes, consoles and seating.Step 2: Remove old deckStep 3: Clean up remaining hull ready to take new bulkheads and stringers.Step 4: Cut and fit new marine ply stringers and bulkheads.Step 5: Cut and fit new marine ply deck having laminated underneath and gell for
…
6th Feb 2015
18 year old Tornado Rib
18 year old Tornado Rib restored.Rib Shop have added some large wear patches, new handles and
deep cleaned the tubes of this 18 year old Tornado Rib, giving the boat a new lease of life.
26th Nov 2014
Ribeye Rib tube renovation
Rib Shop were asked to remove the yellow patches on this
Ribeye and replace them with something less contrasting. The wear patches were
removed and replaced using new black Hypalon making it look much more in keeping
with the rest of the Rib.From this
…
22nd Nov 2014
Bombard Rib - New tubes and Rib deck
Rib Shop re-fit this Bombard 640 with new Hypalon tubes and new synthetic teak decks for a stunning transformation..
10th Nov 2014