Cobra Rib Improvements
Rib Shop have been contracted to carry out improvements to an 8.5 metre Cobra Rib.

The owner was not happy with the standard Cobra Rib drainage arrangement. Many Cobra Ribs drain straight into a sump that is directly connected with the under deck area, with only a bilge pump to rely on to get rid of any water. This combined with the batteries being positions in the rear compartment, means there is a risk of hull and deck flooding.
Rib Shop installed bulk heads and a drainage system with twin 68mm drain sock exits to allow a vast amount of water to be drained out straight from the deck with no need for bilge pumps.

Rib Shop also fitted synthetic teak decking to the Cobra Rib deck, carried out a full deep clean of the tubes and polishing of the console and stainless steel.

Recent Posts
-
Solent Rib deck replacement
Solent Rib deck replacement after the original ply rotted causing a soggy dangerous deck. This is a …17th Nov 2026 -
Yam 550 R retube
Yam 550R retube in Arctic grey Hypalon with grey fitting and Ocean blue style patch. Before: After: …17th Nov 2026 -
Scorpion Serket 8m Rib retube
A retube of this Scorpion Serket 8m Rib in Military grey fabric impression Orca fabric. This Scorpi …12th Oct 2026