Blog
New synthetic teak decking and new double jockey seats fitted to a Ribeye
New synthetic teak decking and new double jockey seats
fitted to a Ribeye 7.5m Rib.
18th Aug 2017
Cobra Rib Improvements
Rib Shop have been contracted to carry out improvements to an
8.5 metre Cobra Rib.The owner was not happy with the standard Cobra Rib drainage
arrangement. Many Cobra Ribs drain straight into a sump that is directly
connected with the under deck area, with only a bilge pump to rely on to get rid
of any water. This combined with the batteries being positions in the rear
compartment, means there is a risk of hull and deck flooding. Rib Shop installed bulk heads and a drainage system with
twi
…
5th Mar 2015
Ribtec Rib re-fit
Rib Shop have been chosen to carry out the extensive Rib
re-fit of a Ribtec 7.5 metre Rib.The Rib re-fit will include complete strip of engine, electronics,
consoles, seating, tubes, deck, bulkheads and stringers.Step 1: Remove tubes, consoles and seating.Step 2: Remove old deckStep 3: Clean up remaining hull ready to take new bulkheads and stringers.Step 4: Cut and fit new marine ply stringers and bulkheads.Step 5: Cut and fit new marine ply deck having laminated underneath and gell for
…
6th Feb 2015
Bombard Rib - New tubes and Rib deck
Rib Shop re-fit this Bombard 640 with new Hypalon tubes and new synthetic teak decks for a stunning transformation..
10th Nov 2014